ASBESTOS
REMOVAL
Asbestos containing materials (ACMs) fall into two categories.
Those that are licenseable and require removal under controlled
conditions by a licensed contractor, and those that require removal in
accordance with HSE Guidelines.
Removal
under controlled conditions
The type of asbestos and its location will determine which category it
falls into. Asbestos removal works under controlled conditions are
subject to a 14-day notification period (to the HSE). For each
job, Oasis present you with site
specific method statements and risk assessments. Where
appropriate we notify the HSE and the Environment Agency of planned
controlled asbestos removal works and hazardous waste disposal.
Air clearance testing
Once asbestos removal works are complete air testing is carried out.
In controlled works air clearance testing is carried out by an
independent UKAS accredited laboratory. The asbestos is then
transported and disposed at a landfill site in accordance with the
Hazardous Waste Regulations 2005.
Project health & safety file
For controlled works an end-of-works health & safety file is
provided which includes air clearance
certification to satisfy any future Health & Safety inspections.
To
discuss your project ring
0117 951
9567 or
mail mail@oasis-bristol.co.uk.
Written tenders should be
addressed
to Mike Shorland, Contracts Manager.
|
|

|
|
licensed
asbestos removal & disposal · asbestos registers · pre-purchase
asbestos surveys · pre-demolition asbestos surveys
|
|